The project consists of the construction of 3 Elevated Stations with FAST Consortium LLC on Riyadh Metro Line 6 (Purple Line) with a length of 29.9 km.
Each Elevated Station consists of a Basement, Four Entrances, Four Connecting Bridges, Two Concourse Levels & one Platform. The project value is SAR 10 million.
The Project is expected to be handed over during 2019